The Challenges
Added complication of having to factor the bus into the drafting plans
Designing and installing a tight-fitting maintenance platform meant there was no margin for error.
Watkins Steel was contracted by Premis Solutions to design, construct, and install 6.2 tonnes of steelwork for a maintenance platform at the Toowong Bus Depot. The job required a mezzanine platform with handrails to be installed, enabling fleet maintenance to be performed by Council workers.
Solutions
- Faro Focus 3D X 130 Laser Scanner
- Telka Structures 3D Modeling Software
- 3D point cloud model to check for clashes
- Voortman V808 Coping Machine
- Trimble RTS773 Total Station for site layout
“I was on-site when Watkins scanned the depot for site measurements—it was very fast. It lead to a great outcome with no site problems.”
Todd Neville, Estimator, Premis Solutions