fbpx

All Hallows School Terraces

All Hallows School Terraces

Watkins Steel was contracted by Naturform to supply and install structural steel & metalwork for All Hallows School in Brisbane. The job required walkway and deck framing as well as balustrades.

Challenges

  • Uneven ground for site measurement
  • Deck footing designed at various heights, including below ground
  • Tight construction frame

 

Solutions

  • Faro Focus 3D X 130 Laser Scanner
  • Telka Structures 3D Modeling Software
  • 3D point cloud model to check for clashes
  • Voortman V808 Coping Machine
  • Trimble RTS773 Total Station for site layout

 

“Watkins Steel were recently engaged by Naturform to complete the structural steel package including covered walkway and deck at our high profile ‘Terraces’ project at All Hallows’ School. Watkins performed extremely well to a tight construction program and delivered a quality, on-time product. Their staff were knowledgeable, pro-active and helpful in overcoming design challenges encountered during the works. I would have no hesitation in recommending Watkins Steel for similar projects moving forward.”

James McGregor, Director, Naturform

Download the full case study

Project Description

Client: Naturform
Location: All Hallows School
Year Completed: 2017